Use the W-AIR headset

Plan requirement

Subscription UC-Basic or higher, x-bees Device or higher

A cordless headset that carries your extension around the building, so you can take calls with your hands free.

Before the first shift

  1. Leave a new headset in the charger for at least ten hours. The first charge is the long one; after that a full charge takes under four hours, and reaches half in about ninety minutes.
  2. Charge it somewhere between 5°C and 25°C and out of direct sunlight. A charger on a sunny windowsill is the usual reason a headset never seems to reach full.
  3. Lift it off the charger. That is what makes it active.
  4. Make one call to yourself to check which ear it is set for and how loud it is.

From then on, calls to your extension ring in your ear rather than on a desk you are not sitting at.

Taking a call

Answer and end calls from the button on the headset. Because it uses the same DECT coverage as W-AIR handsets, you can walk the building while talking.

Charging, and how long it lasts

A full charge gives up to 7 hours of talk time and 100 hours on standby, from a 320 mAh battery. A day of real calls therefore fits, and two days of forgetting the charger do not.

Return it to the charger whenever you are not using it. Single and multi-chargers are available, and a multi-charger at a shared workstation solves most of the "my headset is dead" complaints on its own.

Charge it during breaks rather than only overnight. A headset used all day on a single charge is the one that dies during the call you most needed.

Comfort over a full day

Replaceable ear cushions keep it comfortable and hygienic, particularly where headsets are shared between shifts. They are consumables, so order spares before they are needed rather than after.

When audio is poor

  • Crackling or dropouts while walking points to coverage rather than the headset. Note where it happens.
  • Muffled audio is often a dirty or worn cushion.
  • Only in one spot is a coverage gap, and worth reporting with the location.

Tell us where it drops and we will work out what the base station layout should be. Moving or adding one is then a job for your installer, since we do not do the physical work.

See also

Was this article helpful?

0

Still stuck?

Our support team will take a look with you.

Comments

0 comments

Article is closed for comments.